FDZ Construction LLC

Industrial Concrete Contractor in Wichita, Kansas

Industrial slabs, equipment pads, loading docks, and heavy-use paving for Wichita facilities. FDZ's Wichita-area concrete crew handles this work. Call 316-365-8342.

FDZ's Wichita-area concrete crew handles local industrial projects to the project drawings.

FDZ Construction LLC handles industrial concrete for Wichita-area manufacturing, warehouse, and distribution facilities. The scope includes new warehouse slabs, replacement floor sections, equipment foundations and machine pads, loading docks, and heavy-use paving. Share the related work in one request so slab loads, equipment drawings, access, and construction phases can be reviewed together. Parking lots, curb, and sidewalks are covered on our Wichita commercial concrete page. Call the Kansas project line at 316-365-8342 to discuss your facility.

Request an Industrial Estimate · 316-365-8342

Industrial Scopes for Wichita Facilities

  • Warehouse Slabs — New slab-on-grade warehouse floors and replacement sections poured to the facility drawings for forklift travel, racking, and material handling.
  • Equipment Foundations — Equipment foundations and machine pads placed from the project engineer's details and the equipment supplier's shop drawings.
  • Machine Pads — Machine and equipment bases where anchor layout, thickness, and reinforcement come from the equipment documents.
  • Loading Docks — Dock pits, aprons, and approach slabs coordinated with the leveler shop drawings when a dock is in the scope.
  • Industrial Paving — Truck courts, dock approaches, and yard paving built for repeated heavy axle loads rather than car parking.
  • Industrial Foundations — Foundations and thickened slabs that support industrial buildings when those elements are on the structural set.

Warehouse, equipment, dock, and heavy-use concrete

Warehouse slabs and industrial floors

  • New slab-on-grade warehouse and distribution floors
  • Full or phased floor replacement where the drawings and access allow
  • Base preparation and vapor-retarder work when the plans require them
  • Joints and specified FF/FL targets poured toward the facility documents — not a residential slab detail
  • Return-to-service coordination with the strength or curing requirements on the project
  • Company reference: warehouse slab work (Oklahoma examples)

Equipment foundations and machine pads

  • Concrete bases for generators, compressors, process equipment, and production machinery.
  • Anchor bolts, embeds, and openings set from the supplier's shop drawings
  • Thickness and reinforcement follow the equipment loads on the foundation drawings
  • Isolation and leveling provisions only when the project documents call for them
  • Company reference: equipment pad concrete (Oklahoma examples)

Loading areas and docks

  • Dock aprons, approach slabs, and pit concrete
  • Pit dimensions taken from the leveler manufacturer's drawings
  • FDZ places the concrete; the leveler equipment supplier remains the equipment vendor
  • Company reference: loading dock construction

Heavy-use paving

  • Yard paving and truck courts where trailer traffic is the design case
  • Joint spacing and slab depth matched to that traffic
  • Ordinary car parking is scoped on the commercial page
  • Company reference: truck court concrete

Pads, slabs, and docks are one industrial package

A Wichita plant or warehouse rarely needs only one of these items. The floor, the dock, and the equipment pads are often bid and scheduled together. Share the related work in one request so loads, access, and phases can be reviewed as a package.

If the project is mostly a parking lot, curb, and public sidewalk, use the commercial concrete page. If a grade wall holds the yard or the dock approach, add retaining walls.

Warehouse slabs and floor replacement in Wichita

Warehouse floors must support the operation above them: forklift travel, racking, storage, and material handling. FDZ places new slab-on-grade floors and replacement sections to the project drawings. Slab thickness, reinforcement, concrete mix, and joint layout follow the specified loads and floor use rather than a standard residential detail.

For a new floor, send the slab plan, approximate area, load requirements, and any specified flatness and levelness targets. Include subgrade, aggregate base, and vapor-retarder requirements when they are part of the plans. Subgrade preparation and base requirements are reviewed for the conditions at your Wichita site.

For replacement work, identify the failed areas, provide photos, and explain which aisles, rooms, or loading routes must stay available. The estimate should account for demolition, removal, base correction where required, placement phases, and the strength or curing requirements before the area returns to service. Access and shutdown windows are confirmed for each project.

Equipment foundations and machine pads in Wichita

Equipment concrete starts with the machine and its foundation requirements. FDZ places equipment foundations and machine pads from the project engineer's details and the equipment supplier's shop drawings. The equipment's weight, footprint, operating loads, anchor layout, and installation requirements determine the concrete scope.

Send the equipment make and model, foundation drawings, anchor-bolt plan, and any specified isolation, embeds, conduit openings, or leveling requirements. Tell us whether the base is inside an existing building, whether concrete must be removed, and how crews and equipment can reach the work area. Generator, compressor, process-equipment, and machine-base requests should include the supplier's installation information.

FDZ reviews the concrete construction scope with the project team. Structural design, vibration-isolation design, anchorage design, and equipment installation remain with the responsible engineer, supplier, or installing trade. Equipment is set only when the project's specified concrete strength and installation requirements are met.

What an industrial estimate needs from you

Use this checklist when you call or send the estimate form:

Wichita-area facility location, operating conditions, project contact, and desired schedule.

Warehouse slab or replacement area, equipment base, dock work, or combined scope.

Approximate dimensions or square footage, marked as approximate when not measured.

Slab/structural plans, equipment foundation drawings, loads, anchor layouts, embeds, block-outs, and available site photos.

Forklift, racking, equipment, or truck requirements documented by the project team.

Dock/pit details and equipment-vendor coordination notes when docks are in scope.

Demolition needs, access limits, occupied areas, shutdown windows, and possible phasing.

Your written estimate follows a review of the scope, available plans, and site conditions. If you do not have all the drawings yet, explain what is available so FDZ can identify the next information needed. Call 316-365-8342 for Wichita and Kansas projects.

Wichita and Kansas project line: 316-365-8342. Oklahoma City projects stay on (405) 458-4805.

Connect the industrial scope to the rest of the site

Concrete contractors in Wichita — commercial, industrial, retaining walls, and stamped concrete.

Wichita commercial concrete — parking, curb, sidewalks, and lighter site slabs around the same property.

Wichita retaining walls — grade walls at yards, docks, and building pads.

Company pages for the same kinds of work in Oklahoma City: industrial concrete repair, warehouse slabs, equipment pads, loading docks, and truck courts.

Build notes

  • Concrete strength: Per project plans and the specified industrial or equipment requirements
  • Slab thickness: Per project drawings for forklift, racking, or equipment loads — not a residential default
  • Reinforcement & joints: Installed per the structural or slab notes for that facility
  • Flatness / levelness: Poured toward FF/FL or equipment targets when the project documents specify them
  • Equipment pads: Anchor layout, embeds, and isolation from supplier shop drawings and the project engineer
  • Docks: Pit and apron dimensions from the leveler drawings
  • Base & vapor retarder: Subgrade, aggregate base, and vapor retarder as required by the plans for the Wichita site
  • Cure / return to service: Per mix design and the strength or curing requirements on the project

How industrial concrete gets placed

  1. Document review — Slab notes, equipment drawings, and dock details are checked against the estimate request.
  2. Base preparation — Subgrade and aggregate base are prepared as required by the plans for the loads the slab or pad must carry.
  3. Steel and embeds — Reinforcement, anchor bolts, and pit block-outs are set before concrete arrives.
  4. Placement — Concrete is placed to the specified strength. Large floor areas can be laser-screeded when the project documents call for that flatness.
  5. Joints, cure, and turnover — Joints are cut per the joint plan, and the area returns to service only after the project's strength or curing requirements are met.

Facilities this page is meant to reach

Industrial concrete in Wichita is for buildings and yards where the concrete is part of the operation, not just the parking.

  • Warehouse floors — New slab-on-grade floors and replacements under racking and forklift aisles.
  • Production equipment — Machine pads and equipment foundations tied to a specific piece of equipment.
  • Shipping docks — Pits, aprons, and the paving trucks use to reach the building.
  • Yard paving — Heavy-use concrete between the dock and the property line.

Wichita industrial sites, served by a Wichita-area crew

Industrial calls for this page are facilities in Wichita and the surrounding Sedgwick County area — manufacturing, distribution, and yard concrete where slab, dock, and equipment pads are the job. FDZ's Wichita-area crew handles these projects. Site location and scope are reviewed when estimating. Call the Kansas project line for local work.

Kansas project line 316-365-8342. Oklahoma City line (405) 458-4805.

Frequently Asked Questions

What counts as industrial concrete in Wichita?
Warehouse and industrial slabs, equipment foundations, machine pads, loading docks and aprons, industrial foundations, and paving built for truck traffic. Standard commercial parking is on the commercial concrete page.
Do you pour new warehouse slabs as well as replace existing floors?
Yes. FDZ places new slab-on-grade warehouse floors and replacement sections to the project drawings. Thickness, reinforcement, mix, and joints follow the specified loads and floor use for that facility.
Can floor replacement be planned in phases?
When access and schedule allow, replacement can be planned in phases. Identify which aisles, rooms, or loading routes must stay available. Phasing and shutdown windows are reviewed for each project — FDZ does not promise uninterrupted operation for every occupied facility.
What drawings are needed for a machine pad or equipment foundation?
Send the equipment make and model, foundation drawings, anchor-bolt plan, and any specified isolation, embeds, conduit openings, or leveling requirements. Include access notes and whether existing concrete must be removed.
Who determines slab thickness, reinforcement, anchors, and flatness targets?
The responsible project documents and design professionals govern. FDZ constructs to those drawings. Structural design, anchorage design, vibration-isolation design, and equipment installation stay with the engineer, supplier, or installing trade.
How is a Wichita industrial concrete estimate prepared?
The written estimate follows a review of the scope, available plans, and site conditions. If drawings are incomplete, explain what you have so FDZ can identify the next information needed. Call 316-365-8342 or use the estimate form.
Does FDZ have a Wichita concrete crew?
Yes. FDZ has a Wichita-area concrete crew for local industrial projects. Call the Kansas project line to discuss the scope.

Kansas project line: 316-365-8342 · Estimate form